The USC Upstate Library project highlights East Coast Metal System’s ability to deliver high-performance, design-forward façade solutions through collaboration. The design was led by Moseley and installed by Tidewater Building Group. Our team provided the EC‑200 Dry Joint MCM System™ using Alucobond® 4mm FR ACM across 4,400 sq. ft., consisting of 309 panels in New Age Dark Bronze and 72 panels in Oyster. The finished exterior balances durability, constructability, and a clean modern aesthetic while supporting sustainability goals with measurable performance benefits. These outcomes contributed to the project being recognized by the Green Building Initiative as the 2025 Runner Up for Project of the Year.
Category: Office Buildings
Dayton Convention Center
East Coast Metal Systems (ECMS) helped give the Dayton Convention Center a face lift with its EC-200 Dry Joint MCM System™.
430 North Michigan Avenue
Photo Credits: GNP Reality